STEINEL NEO2 Operations Instructions Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 67
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
- 10 - - 11 -
System components
a ON/OFF button
b feed trigger
c LED indicator
d socket for charging cable
e USB charger
f glue stick
Operating principle
and handling
Before using for the first time, fully
charge the battery (2-3 hours) so
as to prolong its life. (see Charging/
Operation)
Insert glue stick into rear heating
duct.
When using the tool for the first time,
press the trigger several times to fill
the heating chamber with adhesive. It
may also be necessary to give the glue
stick a short push to help it move in.
To prevent the applicator from being
switched ON unintentionally, you
must press the button for approx.
2 sec. Green LED flashes for 15 sec.
Press trigger and apply glue to one
side.
Firmly press together the materials
being glued, correcting alignment if
necessary.
Final bonding strength is reached
after a very short time (approx.
2 minutes)!
Spot glueing is recommended on long
items with large surfaces.
Rigid foam (e.g. polystyrene) can also
be glued without a problem. Merely
remember to apply the hot glue on
the base surface and not on the
polystyrene.
When glueing textiles or similar
materials, it is recommended to
apply the hot glue in "wavy" lines.
Let the applicator cool down
after use.
Charging / Operation
The rechargeable battery in the neo 2
comes partially charged. Before using
the applicator for the first time, fully
charge the battery (approx. 2-3 hours) to
ensure full capacity.
The neo 2 cannot be used while it is
charging.
Interrupting the charge cycle will not
damage the rechargeable battery. The
battery can be recharged at any time
without shortening its lifespan.
"Electronic Cell Protection (ECP)"
protects the battery from exhaustive
discharge. If the battery runs flat, pro-
tective circuitry switches the neo 2 OFF
and glue is no longer heated.
Charging with USB charger
Button LED red LED green
ON/OFF Battery charging
Applicator ready for use for a limited period
Battery is fully charged, charge cycle is completed
Operation / glueing
Button LED red LED green
ON Switch ON. Press button for approx. 2 sec.
Green LED flashes for 15 sec.
Applicator ready for use
Applicator starts for a further 5 min. each time you
press the trigger
No glueing for 5 min.
Applicator switches OFF
Switch applicator back ON at button
Red and green LED flashes alternately after
applicator has been in use for approx. 20 min.
The applicator can now only be used for approx.
another 10 min.
Red LED flashes 1x
Battery flat, start charging using USB charger
Dimensions (HxWxD): 157 x 47 x 158 mm
Power supply: 100-240 V, 50/60 Hz, micro-USB charger
Battery voltage: 3.6-V lithium-ion rechargeable battery
Heating-up time: under 15 seconds
Rechargeable-battery run time: approx. 30 minutes (continuous operation)
Battery charging time: 90% in 3 hours
Melt temperature: approx. 170 °C
Recommended glue sticks: genuine STEINEL
Crystal sticks, Prod. No 040413 /
Ultrapower sticks, Prod. No. 0405005
(Ø 7 mm)
Technical Specifications
GB
Page view 5
1 2 3 4 5 6 7 8 9 10 11 ... 66 67

Comments to this Manuals

No comments